Amphitryon Rehearsal - April 20, 2006
Observations (Pre-Rehearsal):
- Set grows
- Railing is complete, walls are painted, statues are in place, rotating walls, background is painted black, shutter on one window
- Stage managers tells actors to check props and sweeps floor
- Actors inspect growth of the stage
- Actors don't seem to practice lines tonight
- Director plays with differet lighting options with set builder
- Actors get their shoes
- Physical warm-up
- Clack and actors pair up and warm-up vocally and physically
- Actors form a line of massages much like a conga line
- Stage manager is very quick to get actors back on task when they forget what they are doing (very in charge!)
- Play "YES" game
- Director has the whole group close their eyes and meditate, think about what they are about to do
- Very focused tonight
- The Director keeps track of the time to see how long the performance lasts
- The actors go through the entire performance without stopping
- Director adds musical cues to the scenes
0 Comments:
Post a Comment
<< Home